Landed Pricing, Coast to Coast
Bluff Manufacturing + Copperloy dock boards for sale

Authorized Bluff Manufacturing + Copperloy Dealer

Dock Boards & Plates — Aluminum + Steel, Forklift-Rated

Bluff and Copperloy aluminum & steel dock boards — 10,000–40,000 lb capacity, bolt-on or welded curbs, multiple widths. P-card friendly, free LTL freight, manufacturer-direct lead times.

ANSI / OSHA Compliant

Free LTL Freight

1-Business-Day Quote

Authorized Bluff Manufacturing + Copperloy Dealer

Talk to a Specialist

Need help sizing? Call our application engineers.

(949) 773-2777

18 Model Families · 583 SKUs · Real Specs · Real Lead Times

Shop Bluff Manufacturing + Copperloy

Bluff SP Steel Platform (Mobile Dock)24 options

Bluff Manufacturing

Bluff SP Steel Platform (Mobile Dock)

as fast as
1–3 Weeks

from$13,329.00

View Options
Bluff SC Steel Dock Board w/ Welded Curbs24 options

Bluff Manufacturing

Bluff SC Steel Dock Board w/ Welded Curbs

as fast as
3–5 Business Days

from$1,829.00

View Options
Bluff SB Speedy Board (Steel Dock Board)50 options

Bluff Manufacturing

Bluff SB Speedy Board (Steel Dock Board)

as fast as
3–5 Business Days

from$1,829.00

View Options
Bluff T Steel Dock Board (Pin Style)41 options

Bluff Manufacturing

Bluff T Steel Dock Board (Pin Style)

as fast as
3–5 Business Days

from$2,909.00

View Options
Bluff TFL Steel Dock Board (Fixed Legs)47 options

Bluff Manufacturing

Bluff TFL Steel Dock Board (Fixed Legs)

as fast as
3–5 Business Days

from$2,659.00

View Options
Bluff TNB Steel Dock Board (No Dockside Bend)36 options

Bluff Manufacturing

Bluff TNB Steel Dock Board (No Dockside Bend)

as fast as
3–5 Business Days

from$2,659.00

View Options
Bluff C Steel Red-Pin Dock Board67 options

Bluff Manufacturing

Bluff C Steel Red-Pin Dock Board

as fast as
3–5 Business Days

from$3,109.00

View Options
Bluff AC Aluminum Dock Board w/ Bolt-On Steel Curbs19 options

Bluff Manufacturing

Bluff AC Aluminum Dock Board w/ Bolt-On Steel Curbs

as fast as
2–3 Business Days

from$1,589.00

View Options
Bluff ATD All-Aluminum Welded Dock Board17 options

Bluff Manufacturing

Bluff ATD All-Aluminum Welded Dock Board

as fast as
Contact for Lead Time

from$1,789.00

View Options
Bluff A Aluminum Dock Plate27 options

Bluff Manufacturing

Bluff A Aluminum Dock Plate

as fast as
2–3 Business Days

from$829.00

View Options
Bluff B Aluminum Dock Plate (Heavy-Duty)17 options

Bluff Manufacturing

Bluff B Aluminum Dock Plate (Heavy-Duty)

as fast as
2–3 Business Days

from$919.00

View Options
Bluff BC Aluminum Dock Board w/ Bolt-On Steel Curbs10 options

Bluff Manufacturing

Bluff BC Aluminum Dock Board w/ Bolt-On Steel Curbs

as fast as
2–3 Business Days

from$2,159.00

View Options
Copperloy STR Steel Truck Dockboard58 options

Copperloy

Copperloy STR Steel Truck Dockboard

as fast as
2–3 Weeks

from$2,759.00

View Options
Copperloy ABC Aluminum Dockboard w/ Bolt-On Curbs36 options

Copperloy

Copperloy ABC Aluminum Dockboard w/ Bolt-On Curbs

as fast as
1–2 Weeks

from$1,209.00

View Options
Copperloy ATR Aluminum Welded Dockboard45 options

Copperloy

Copperloy ATR Aluminum Welded Dockboard

as fast as
2–3 Weeks

from$1,409.00

View Options
Copperloy LP Aluminum Dockplate (3/8 in.)22 options

Copperloy

Copperloy LP Aluminum Dockplate (3/8 in.)

as fast as
1–2 Weeks

from$429.00

View Options
Copperloy TLP Aluminum Dockplate (1/2 in.)25 options

Copperloy

Copperloy TLP Aluminum Dockplate (1/2 in.)

as fast as
1–2 Weeks

from$839.00

View Options
Copperloy SP Steel Truck Dockplate18 options

Copperloy

Copperloy SP Steel Truck Dockplate

as fast as
1–2 Weeks

from$1,739.00

View Options

Safety & Compliance

ANSI / OSHA Compliant — Engineered for Severe Use

ANSI/OSHA-compliant dock boards with structural safety curbs to prevent forklift run-off (Bluff Speedy Boards feature 6-inch curb spacing). Engineered for the dynamic loads of three-wheel forklifts and continuous-shift operations.

ROI & Infrastructure

Skip the Permits — Turnkey Industrial Equipment

Bolt-on steel curbs mean no welding labor and no permanent modifications. Replace a warped or under-rated board — manufacturer-direct ship without shutting your dock down for weeks of fabrication.

Ready to Buy?

Get an Honest Landed-Cost Quote — Fast Turnaround

Product price + LTL freight, returned within one business day. No bait-and-switch pricing. No surprise freight surcharges.